I started with a 4ft pole and sledgehammer then pulled that out and used a longer pole, then I dug out a few feet and managed to get the 14ft pole in, and using stepladders wacked it down with the sledgehammer, Im still having problems with the pump and the mdpe pipe, I cant get it air tight to create suction, so I am looking at borrowing a threader to thread the main scaffold pipe in the ground and attach the pump directly, I have been offered an old cast iron sand pump from a veteran on the site which should be a great help, if I can get the pipe threaded! Im sure Im not far away now.