Picture posting is enabled for all :)
I suppose that I'm tempting fate by saying that I've had my small half plot, which is about 30 by 60 feet, nearly three years and haven't paid anything yet! :)
We pay £11.75 inc insurance & water. It's a half plot 18' x 56'. We get it half price as we are OAPs. Don't know haw many poles we have ::).
I pay £13 for per plot for a 25m x 10m area - I have 2 plots side by side. My site doesn't have water though. :(
Hi - Can someone please help me with a couple of calculations?I've got two plots, which I know the metre size of, and I'm trying to calculate the poles.Are these correct?1. 4.5m x 20m = 90 m2 = 2.95 poles2. 6m x 17m = 102 m2 = 3.35 poles
Quote from: irnhed on March 16, 2010, 12:42:53Hi - Can someone please help me with a couple of calculations?I've got two plots, which I know the metre size of, and I'm trying to calculate the poles.Are these correct?1. 4.5m x 20m = 90 m2 = 2.95 poles2. 6m x 17m = 102 m2 = 3.35 polesNo. 1 pole == 25 m2, so:1. 90 m2 == 3.6 poles because 90/25 == 3.62. 102 m2 == 4.1 poles because 102/25 == 4.1
I'm waiting to see whether I get half my money back now that mine's been divided into two (at my request). I'm not holding my breath! ::)